The NRRM will be starting the annual Dust Control Program starting on June 28/29, depending on when the contractor is available. The anticipated schedule we will be following is below:
Day | Area |
---|---|
Day 1 |
Andy Bailey Road from Highway, also into the Campground.
Tetsa Campground
|
Day 2 |
Simpson, McConachie bypass, and Pioneer Way
Fediw, Tazma
Pebble and Pristine
Highland Drive
Valley View Road
Caribou, Rocky Mountain, White Tail, Fairway, Radar Crescent
Cemetery Road
306 Sub, Forbes Road
Grouse Trail
|
Day 3 |
Mile 292 Subdivision
294 Frontage Road
Klahanni Rd
Lagoon Rd
Sani Dump Road
Dump Road
|
Formula 35 Premium Dust Control Product
Formula 35 Premium Dust Control is a liquid calcium chloride formula for optimal dust control and road stabilization. Not only is Formula 35 Premium Dust Control a powerful soil stabilization and dust abatement solution, it also helps protect road bases from freezing and frost heaving. More information