Intersection Culvert Replacement
The Ministry of Transportation and Infrastructure has identified the need to replace the culvert at the Airport Drive and Alaska Highway intersection. The NRRM is working cooperatively with the Ministry to ensure this work is completed, however due to the current construction season coming to a close, the culvert replacement and paving at the intersection will not take place until the 2024 construction season.
We apologize for the inconvenience and hope to get this completed as soon as possible.