The 2016 Capital Projects for Buildings and Facilities in the Northern Rockies include:

Public Works Shop Renewal

Budget: $50,000
Funding Sources: 
NRRM; Province of BC
Construction Start Date: 
2016
Type of Work: 
Renewal
Description:  
The Public Works Shop roof has experienced some leaking over the past couple years. Upon assessment, it was confirmed that the roof is in reasonable shape overall for its age and a roof replacement is 5 to 10 years pre-mature.

In 2016, spot repairs will be completed as well as refresh roof seals and vents to lengthen the life of this structure.

Project Updates: Available as project progresses

Cemetery Fence Renewal

Budget: $15,000
Funding Sources: 
NRRM; Province of BC
Construction Start Date: 
2016
Type of Work: 
Renewal
Description:  
The cemetery fence is in need of renewal. 2016 work includes replacing the cemetery fence along the south east side.

Project Updates: Available as project progresses

Waste Diversion Initiatives - Composting

Budget: $1,100,000
Funding Sources: 
NRRM; Infrastructure Canada
Construction Start Date: 
2017
Type of Work: 
Upgrade
Description:  
The NRRM is moving forward with our waste diversion program, looking specifically at composting. Estimated costs for the installation of an Aerated Composting process is in the amount of $1,100,000 with annual operating costs estimated at approximately $100,000. There was an April grant opportunity for projects within the Infrastructure Canada Small Communities Fund. A project in support of waste diversion is a prime candidate for success and we have submitted an application. A $730,000 grant has been requested. At this time, this project is dependent upon approval of the Small Communities Fund grant. Should we be successful, construction would commence in 2017.

Project Updates: Available as project progresses

Landfill Renewal

Budget: $500,000
Funding Sources: 
NRRM; Province of BC
Construction Start Date: 
2016
Type of Work: 
Renewal
Description:  
The existing population utilizes landfill space every year, requiring the regular renewal this asset. The need for new cells is dependent upon volumes of waste received and will be deferred as necessary should solid waste volumes decrease. Future cell readiness is pertinent to continued landfill use. The 20 year capital plan identifies a rotating renewal budget to address landfill requirements, which consists of replacing existing cells as needed, maintenance and repair of drainage, roads, buildings, and electricity. Any funds remaining unspent will be set aside for future renewal needs. In 2016, cell 5 will is ready to tender for construction this summer. In addition to cell construction, other minor repairs will be made to buildings and fences.

Project Updates: Available as project progresses

Northern Rockies Regional Recreation Centre Phase 3 Completion

Budget: $262,000
Funding Sources: 
NRRM
Construction Start Date: 
2015
Type of Work: 
Upgrade
Description:  
Construction of a pool at the recreation centre was initiated in 2015.  Of the $880,000 remaining funds, $262,000 is required as carry-over for 2016 to look after remaining process draws and holdbacks that are part of the construction project.

Project Updates: Available as project progresses

Rec Centre Lamplighters Parking Lot

Budget: $34,500
Funding Sources: 
NRRM
Construction Start Date: 
2016
Type of Work: 
Deficiency Mitigation
Description:  
In 2014 the Lamplighters Parking Lot was established well under budget. However, there have been drainage issues with adjacent properties. A design was drafted to tie into the storm system on 50th Avenue. 2016 work includes constructing planned drainage, typing the parking lot into the storm system to properly address drainage to adjacent properties in this area.

Project Updates: Available as project progresses